Displaying Diary Entries for Unit: 14260 |
Page 1 of 1 (Total Records: 5)
|
Name: | Naomi Christie |
Team: | West-Buffalo/Camb |
Date: | 7/4/2007 |
Entry: | I am very tired.
Today I dug down 10cms on U14213 to the south of where Katie, Ben and Ray were digging. I spent the morning digging down and cleaning back, and eventually a grave cut came clear, which lies alongside the grave Alex and a girl from the... click here for more... |
|
Name: | ER |
Team: | West-Buffalo/Camb |
Date: | 7/7/2007 |
Entry: | Yesterday we had a great but tiresome field trip together with the Poznan team and Nurcans pottery lab to Asikli Hoyuk, Tepecik-Ciftlik, Gelveri, Golludag, the Nigde Museum and Kosk Hoyuk.
The day before, Thursday 05.07.07, everybody was fit and healt... click here for more... |
|
Name: | Alex Pryor |
Team: | West-Buffalo/Camb |
Date: | 7/8/2007 |
Entry: | Today has been a good day. This morning I was finishing off the grave feature 2416, removing the remaining original fill from around where the coffin was placed (14260). This was packed full of far more finds than the collapse that filled the coffin itsel... click here for more... |
|
Name: | ER |
Team: | West-Buffalo/Camb |
Date: | 7/8/2007 |
Entry: | As agreed upon yesterday, the Selcuk team members now work on their own, supported by Scott who will be out with us during the next two weeks. Only now I realized how much better things work out in the EC structures if I can really be with our team and ha... click here for more... |
Sketch: | Click here to open in a new window |
|
Name: | Naomi Christie |
Team: | West-Buffalo/Camb |
Date: | 7/10/2007 |
Entry: | 7th July Photos
U13751- After removal of mud brick trench lining
U14213 -Katy and Ros's area on North wall
U14267- Skeleton
U14270 - Tom and Helen's burrow/pit
U14271 - Cut of pit
U14272 - The pit Ray and I dug
U15104 - Floor in T7
8th July Pho... click here for more... |
|
|