Displaying Diary Entries for Unit: 15140 |
Page 1 of 1 (Total Records: 3)
|
Name: | JMR |
Team: | |
Date: | 8/4/2010 |
Entry: | JFB, BOD and XHB finished excavating burial F.3317 which will be drawn tomorrow. Burial F.3316, its extensions defined by BOD through scraping (15146) turned out to be partially under F.3317 and can therefore only be started after 3317 is removed.
The ... click here for more... |
|
Name: | PTW |
Team: | |
Date: | 8/4/2010 |
Entry: | The opening of Trench 5 for the season has gone smoothly thus far and our team is proving very effective. I’ve spent the last two days working in unit 15140 , space 310 with JMR, extending Southward. Plaster lines in the plan have revealed buttresses in... click here for more... |
|
Name: | PTW |
Team: | |
Date: | 8/7/2010 |
Entry: | Progress in space 310 has been a bit slow recently. JFB continues to excavate the burial (F. 3318) in the Southwest corner, which is exposed and nearly complete minus the lower limbs. The requirements of JMR as Trench Master and mine as surveyor do plac... click here for more... |
|
|