Name: Shahina Farid 
Team: Field Director 
Date: 8/21/1996 
Entry: Wendy and Evan discussed the sampling strategy of the ochre dust (1525) first thing this morning. The spread is going to be half sectioned but the lower layers also have to go down in half section before Wendy can take her micromorph. section. Evan took ... click here for more... 
 
Name: Shahina Farid 
Team: Field Director 
Date: 8/26/1996 
Entry: Bit of a non eventful day, we seem to be in a cycle of one good day and one non day. Mary and Roddy are excavating more rubbish, Jon is still excavating his wall which has several types of brick and mortar and marl, possibly infilling a niche? but in a ve... click here for more... 
 
Name: Shahina Farid 
Team: Field Director 
Date: 8/30/1996 
Entry: It's friday today but as I didn't finish my report on Wed. nor write one on Thurs. here I am recapping on the l;ast two days events. The week actually ended on quite a high workwise, I think we can see real progress and others have also noted a huge chan... click here for more... 
 
Name: Shahina Farid 
Team: Field Director 
Date: 8/31/1996 
Entry: The major event of today was the conservators rig being erected. Some very heavy pieces were lifted into place by the workmen,really quite awful to watch but it was done successfully. Work is progressing nicely, Anwen began excavating the large cut in spa... click here for more... 
 