The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Unit: 15364

Page 1 of 1 (Total Records: 4)
Name: JMR 
Team:  
Date: 7/24/2011 
Entry: Excavation in the units with much soil went slowly today as the two sifting workman were missing. DLG continued U.15358, CMB and DKK continued U.15357. HLS continued going down and finding the cut in pit F.3331. It is now rather clear that there must be a... click here for more... 
 
Name: XHB 
Team:  
Date: 7/24/2011 
Entry: Today I continued the excavation of space 446, which I had already worked on during last year's season. This space is bounded by the baulk on the N, a possible bench, F. 3320, and F. 3335 on the W, F. 3321 on the E, and space 452 on the South. The initial... click here for more... 
 
Name: XHB 
Team:  
Date: 7/25/2011 
Entry: Excavation of space 446 and unit 15364 was continued today. What yesterday was identified as a possible wall running in a NE-SW direction (into the N baulk and F. 3320) was excavated. The interpretation of this feature as a wall remains unclear to me, par... click here for more... 
 
Name: XHB 
Team:  
Date: 7/26/2011 
Entry: Unit 15371 was fully excavated today. Three different areas can be distinguished in this unit: a clearly identified plaster floor, a compacted yellowish brown sandy surface (it is unclear whether this is part of the same floor) and an area of fill. ... click here for more... 
 