Name: JMR 
Team:  
Date: 8/9/2011 
Entry: We are preparing towards the end of the field season this year, and so far all spaces and excavation areas seem to come to a smooth and logical end ... let’s hope nothing unexpected (burials, gold, ovens) will happen in the next days! DKK drew Space 34... click here for more... 
 
Name: RHB 
Team:  
Date: 8/9/2011 
Entry: Following on from the discovery of chalcolithic walls instead of a burial yesterday, and as the line of this wall plaster was so clearly visable, today I went into space 454 and removed the rest of the room and pit fill (U.16967) to expose the wall surfac... click here for more... 
 
Name: JMR 
Team:  
Date: 8/10/2011 
Entry: Second last day in the trench, and a exciting day. Apart from very nice small finds, and in general many finds, we attributed two new building numbers: The building encompassing Spaces 310 and 454 is now Building 106, since its southern wall (F.3352) was ... click here for more... 
 
Name: HLS 
Team:  
Date: 8/10/2011 
Entry: Having been helping out in the heavy residue lab for the last two days it was really great to be back on site, in my space and with the team again. Although it was interesting to see the work that goes into sorting the flotation material, labelling and se... click here for more... 
 