Displaying Diary Entries for Unit: 2200 |
Page 1 of 1 (Total Records: 3)
|
Name: | Mira Stevanovic |
Team: | Bach |
Date: | 8/13/1997 |
Entry: | AUGUST
10 (S): Beginning the excavation. Scraping
11 (M): Scraping
12 (Tu): Drawing. Establishing the grid for the excavation
13 (W): Opening units 2200, 2201, 2202, 2203, 2204, 2205Entered By: Mira Stevanovic |
|
Name: | Ruth Tringham |
Team: | Bach |
Date: | 8/14/1997 |
Entry: | By the end of today Mira and I were a bit discouraged and depressed that perhaps we were actually excavating below the floor which had already been eroded. Shahina suggested a little mini-sondage. So we took her advice and dug a 10 x 10 cm sondage against... click here for more... |
|
Name: | Ruth Tringham |
Team: | Bach |
Date: | 8/16/1997 |
Entry: | Today we finished excavating the first arbitrary level of building fill in space 86. Ivan draws it (97/201).
Start excavating second arbitrary level of building fill in space 86 (except SE corner), now that we know (see last Thurs) that the wall plaster... click here for more... |
|
|