Name: | DSE |
Team: | |
Date: | 8/14/2013 |
Entry: | Today I have been working on a new unit (31179) of F. 3306. The task was the leveling of the unit in order to get a proper profile of the connection between this feature and F. 2429. Secondly do we intent to know, how this wall (F. 3306) is constructed. T... click here for more... |
|
Name: | DSE |
Team: | |
Date: | 8/16/2013 |
Entry: | This is the Report for the 15.08.2013:
Today I finished the units 31124 and 31179. After removing the interfill (31124) and going further down at F. 3306 (unit 31179), the west profile of feature 5074 showed a swift of the plaster line at unit 18351. I... click here for more... |
|
|