The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Unit: 31180

Page 1 of 1 (Total Records: 3)
Name: NMR 
Team:  
Date: 8/14/2013 
Entry: Today I removed the plaster 31142 that was remaining on the hill's slope. Under it was the fill 31175, sometimes very thick and sometimes unexistent, that looks quite disturbed to me, mayb mimit hole or crack in the plaster. This showed me that the plaste... click here for more... 
 
Name: NMR 
Team:  
Date: 8/17/2013 
Entry: This is the report of 15.08.13 Today I finished removing the fill layer 31180. It appeared to be quite thick towards north, and thin towards south. Under it is a plaster layer which is not yet 31174. It has an approximately half oval shape. TET started... click here for more... 
 
Name: NMR 
Team:  
Date: 8/17/2013 
Entry: This is the report of 15.08.13 Today I finished removing the fill layer 31180. It appeared to be quite thick towards north, and thin towards south. Under it is a plaster layer which is not yet 31174. It has an approximately half oval shape. TET started... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell