Displaying Diary Entries for Unit: 8086 |
Page 1 of 1 (Total Records: 3)
|
Name: | Richard Turnbull |
Team: | Çatal |
Date: | 7/4/2004 |
Entry: | Roddy has pretty well covered what I've got up to so far - apart from the few ephemeral hearth? deposits and eroded floor layers I've been removing the platform extension F.1317 which was releeased by the excavation of floor (8086). F.1317 wasn't in great... click here for more... |
|
Name: | Richard Turnbull |
Team: | Çatal |
Date: | 7/5/2004 |
Entry: | Jason came up this morning and did the first shot of building 10 in it's entirety since we began excavating this year. Removed a narrow strip of horizontal plaster with red pigment on the surface (10615) that lay along the E.edge of F.1314 & F.1317. This... click here for more... |
|
Name: | Roddy Regan |
Team: | Çatal |
Date: | 7/6/2004 |
Entry: | Three days on since my last entry (i think?)
Anyway things seem to be going well in building 10. Lots of contexts hav been removedç mostly floors below the platforms (phisically below). It looks like Platform F1307 may be released first as the we are... click here for more... |
|
|