The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Building: 24

Page 1 of 1 (Total Records: 3)
Name: EJ 
Team:  
Date: 6/30/2015 
Entry: The first couple of days we cleaned our building, checked up on old documentation, placed targets and generated a 3D-model. Basically we are trying to do all pre-documentation steps properly before we excavate. However, when we start it will be a straight... click here for more... 
 
Name: Erik Johansson 
Team:  
Date: 7/5/2015 
Entry: We have had a very productive couple of days in B17. The south walls of B24 and B6 are coming down and at the foundation of F.485 we came across a buchrania that the conservation team are solidifying in order for us to continue dismantling the wall. S... click here for more... 
 
Name: Erik Johansson 
Team:  
Date: 7/9/2015 
Entry: Stratigraphical introduction to the area including B43, B160, B24, B6, B17, South shelter - Mellaarts Shrine 8 and 10 sequence. Last year (2014) the last features of B43 was excavated (except for some foundation burials). Due to the uncovering of two cra... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell