Entry: | Been digging a couple of foundation trenches for the past week or so and finished trenches 3 and 6. To dig foundation trench 14 we have had to remove the block of strat left by the late foundation trench and the 2005 limit of excavation just to the west o... click here for more... |
|
Name: | Lisa Yeomans |
Team: | Çatal |
Date: | 7/15/2007 |
Entry: | Finished in two of the eastern foundation trenches last week and have moved inside the shelter to the block of truncated strat left by the foundations of the NE corner of building 41 that was never dealt with in 2006. This area had to be taken down into ... click here for more... |
|
Name: | LY |
Team: | |
Date: | 7/21/2008 |
Entry: | Work in space 271 has been continued. Between various layers of dump material there has been a sequence of firespots. Additionally a clear surface (16714) was excavated sealing the largest of the fire spots (16715). The surface was a laminated deposit w... click here for more... |
|
|