Name: JMR 
Team:  
Date: 8/15/2010 
Entry: PTW removed the possible installation F.3325 today (the "bukranium"). It sits on a strange bump of plaster, mortar and mud brick (?), but does not seem to be an installation, as I believe - rather a coincidence. He also found the continuation of the floor... click here for more... 
 
Name: SCS 
Team:  
Date: 8/15/2010 
Entry: Excavator's log, Catal Date: Fifteenth of August Two thausend and ten anno domini. It's getting exciting. I continued pickaxing today and - 'lo! - what wonders were wont to appear. The walls 2428 and 2429 and the fill inbetween were rather nicely vi... click here for more... 
 
Name: SCS 
Team:  
Date: 8/16/2010 
Entry: Excavator's log, Catal Date see last entry + 1. Ghost chases can be fun, but the next morning they are usually over. So this one as well: Where there might have been a disturbance with a lot of charcoal and burnt clay, this morning there was only a fresh... click here for more... 
 
Name: JMR 
Team:  
Date: 8/17/2010 
Entry: SCS continued working on the clarification of Features 2429, 2428, 3327, 5052 and 3320. Unfortunately, the decision abutting/ binding into for F.2428 and 5052, and also 2429 and 3327, is still not possible - partially because of the rodent holes and parti... click here for more... 
 
Name: SCS 
Team:  
Date: 8/17/2010 
Entry: Excavator's log, someday. After removing loads and loads of soil the past days, it seems to me as if I haven't done anything today. I had only 9 and a half buckets à 10l. It was spoil from scraping and leveling, going down 3 more centimeters here and thr... click here for more... 
 
Name: JMR 
Team:  
Date: 8/18/2010 
Entry: JFB continued in pit F.3331, where a lot of non-articulated human bones now appear everywhere in the northern part and under the large stone, which was taken out today. Before taking it out, we documented the state of excavation in drawing and photo. E... click here for more... 
 
Name: SCS 
Team:  
Date: 8/18/2010 
Entry: Excavator’s log, 18th August 2010 Today was _so_ cool. ;-) I drew most of the unit 15181, which now consist of two walls (F. 2428 and 2429) running next to each other in a third wall, which cuts them at not quite 90 degrees (F. 3327), which in turn is c... click here for more... 
 
Name: SCS 
Team:  
Date: 8/23/2010 
Entry: Excavator's log, Catal Date: last digging day. This last day of actual digging was spent actually cleaning, after I finished (at last!) my drawing of unit 15181. I worked with BOD in space 450, cleaning and clearing F. 5052 , 5053/5054 (and a bit F. 50... click here for more... 
 
Name: JMR 
Team:  
Date: 8/8/2012 
Entry: In Building 106, KTX drew and photographed plans and details of wall F.5058 and buttress F.3301. After recording, he started to take the southern part of F.5058 down to the brick layer we chose to uncover entirely, as an example. Southern F.5058 is still ... click here for more... 
 
Name: JMR 
Team:  
Date: 8/9/2012 
Entry: Today after breakfast we had a very nice trench tour, during which everybody talked about their area and we discussed details of the contexts and the strategy for the following days. GWN and JHB spent the day in B.98 wrapping up the contexts we have ti... click here for more... 
 