Displaying Diary Entries for Feature = 58 |
Page 1 of 1 (Total Records: 7)
|
Name: | Shahina Farid |
Team: | Field Director |
Date: | 8/27/1996 |
Entry: | Quite a good day, although we're still stuck in our arbitrary space divisions. As soon as the walls are completely out I shall allocate a new space number, I'll also have to back track and reallocate certain units below the walls to the new space number. ... click here for more... |
|
Name: | Shahina Farid |
Team: | Field Director |
Date: | 8/28/1996 |
Entry: | The Mell area is looking a lot better, we've almost got the walls down. Jon worked in the lab for most of the day so Mary took over taking his wall, feature 58, down. The lower wall (1578) is beginning to be just as complicated as the overlying wall, cons... click here for more... |
|
Name: | Shahina Farid |
Team: | Field Director |
Date: | 8/30/1996 |
Entry: | It's friday today but as I didn't finish my report on Wed. nor write one on Thurs. here I am recapping on the l;ast two days events. The week actually ended on quite a high workwise, I think we can see real progress and others have also noted a huge chan... click here for more... |
|
Name: | Shahina Farid |
Team: | Field Director |
Date: | 8/31/1996 |
Entry: | The major event of today was the conservators rig being erected. Some very heavy pieces were lifted into place by the workmen,really quite awful to watch but it was done successfully. Work is progressing nicely, Anwen began excavating the large cut in spa... click here for more... |
|
Name: | Shahina Farid |
Team: | Field Director |
Date: | 9/1/1996 |
Entry: | Bit of a hectic day today, lots of people in a small are again, sometimes I feel I've not been organised enough to keep everyone effectively employed. I beagan the day by equipping the Greek team, we're a bit sghort of supplies at the moment and it's a bi... click here for more... |
|
Name: | Shahina Farid |
Team: | Field Director |
Date: | 9/9/1996 |
Entry: | A few days have lapsed since I made my last diary entry. The walls to the N and S have been recorded and partially excavated. Jon worked on the S wall or non-wall as it turned out, to the S of 106. There appears not to have been a S wall, or possibly no... click here for more... |
|
Name: | Shahina Farid |
Team: | Field Director |
Date: | 9/28/1996 |
Entry: | Last diary entry for this season. We spent much of this week recording sections and walls as well as taking down walls that were not going to survive the following year. Space 117 is at a 1.2m depth from the N wall, the void in the centre of the room h... click here for more... |
|
|