Displaying Diary Entries for Unit: 1063 |
Page 1 of 1 (Total Records: 3)
|
Name: | Shahina Farid |
Team: | Field Director |
Date: | 8/8/1996 |
Entry: | For some reason today was a lot less stressfull, maybe because everyone is getting used to the system and of course we're now more or less fully equiped.
Roddy and Mary excavated (1066) overlain by (1064), the reason being that it was a thin ashy laye... click here for more... |
|
Name: | Shahina Farid |
Team: | Field Director |
Date: | 9/1/1996 |
Entry: | Bit of a hectic day today, lots of people in a small are again, sometimes I feel I've not been organised enough to keep everyone effectively employed. I beagan the day by equipping the Greek team, we're a bit sghort of supplies at the moment and it's a bi... click here for more... |
|
Name: | Shahina Farid |
Team: | Field Director |
Date: | 9/3/1996 |
Entry: | A slow day today, most of which was spent recording walls as I mentioned yesterday. Jon took the opportunity to work on pottery as he'd got to a stage where we need Anwens area to catch up in space 107, now 115. I'm doubtful about the foundation cut Ali ... click here for more... |
|
|