Displaying Diary Entries for Unit: 15172 |
Page 1 of 1 (Total Records: 4)
|
Name: | SCS |
Team: | |
Date: | 8/10/2010 |
Entry: | Excavator's log.
After spending some time "teasing out" the remains of plaster along the walls in space 345, unit 15168 (and being shown by our resident trenchmaster that this can be done faster than I was doing it), I remembered to bag the usual samples... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/11/2010 |
Entry: | LKH, SCS and PTW continued taking out roomfill in their spaces and exposing the plastered walls (Space 345: 15172; Space 447: 15163, Space 448: 15166). Checking again the easternmost exposed part of Space 447, it now seems that wall F.3323 does continue t... click here for more... |
|
Name: | SCS |
Team: | |
Date: | 8/11/2010 |
Entry: | Excavator's log. Date: doesn't matter - Time: far too late.
I continued to work in my space 345 and finished excavating unit 15172. Especially along the Eastern wall I found some wall plaster, which still is in its place, though adorned by holes lovingly... click here for more... |
|
Name: | SCS |
Team: | |
Date: | 8/12/2010 |
Entry: | Excavator's log, some Thursday.
First thing I did today was to take out the finds of unit 15172 that had remained in the space for the foto. X1 is a large grinding stone, that had lain on it's belly. As I started scraping all the bumps away that had held... click here for more... |
|
|