The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Unit: 15335

Page 1 of 1 (Total Records: 4)
Name: JMR 
Team:  
Date: 8/18/2010 
Entry: JFB continued in pit F.3331, where a lot of non-articulated human bones now appear everywhere in the northern part and under the large stone, which was taken out today. Before taking it out, we documented the state of excavation in drawing and photo. E... click here for more... 
 
Name: SCS 
Team:  
Date: 8/18/2010 
Entry: Excavator’s log, 18th August 2010 Today was _so_ cool. ;-) I drew most of the unit 15181, which now consist of two walls (F. 2428 and 2429) running next to each other in a third wall, which cuts them at not quite 90 degrees (F. 3327), which in turn is c... click here for more... 
 
Name: JMR 
Team:  
Date: 8/21/2010 
Entry: EMM continued working on the clay ball cluster U.15343 in Space 449. Its outlines are visible now, it is a heap of balls in the eastern part of the trench, fading towards west. IF finished room fill U.15335 in Space 310. At the present level, a seemingly ... click here for more... 
 
Name: SCS 
Team:  
Date: 8/23/2010 
Entry: Excavator's log, Catal Date: last digging day. This last day of actual digging was spent actually cleaning, after I finished (at last!) my drawing of unit 15181. I worked with BOD in space 450, cleaning and clearing F. 5052 , 5053/5054 (and a bit F. 50... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell