The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Unit: 15357

Page 1 of 2 (Total Records: 12)
Name: CMB 
Team:  
Date: 7/23/2011 
Entry: We have continued to down the topsoil of unit 15357 (about 20cm down). Since the beginning of the excavation we have down about 60-70cm in this unit and we follow the “natural” slop. Near to the burial area (unit 15346), I noted several perturbations like... click here for more... 
 
Name: JMR 
Team:  
Date: 7/23/2011 
Entry: Thursday 21st July we continued excavating in the trench extension. DLG continued U.15358 west of Sp.343 and 342. DKK, CMB and EMM continued the massive U.15357 over the southern part of Sp.342, where JFB also excavated, documented and removed the skull o... click here for more... 
 
Name: DKK 
Team:  
Date: 7/23/2011 
Entry: This is my first time at Catalhöyük, and this is my first diary entry of the season. Today, we have begun our second week of excavating. We have been expanding the square of trench 5 on the west mound in the south-western and western corner whilst waitin... click here for more... 
 
Name: DKK 
Team:  
Date: 7/24/2011 
Entry: CMB and I are still working on unit 15357. We have moved a lot of dirt today and had a lot of finds, but there is still much topsoil to remove. I do hope that we can finish clearing the unit tomorrow. We only had one worker to help us sift for just a par... click here for more... 
 
Name: JMR 
Team:  
Date: 7/24/2011 
Entry: Excavation in the units with much soil went slowly today as the two sifting workman were missing. DLG continued U.15358, CMB and DKK continued U.15357. HLS continued going down and finding the cut in pit F.3331. It is now rather clear that there must be a... click here for more... 
 
Name: CMB 
Team:  
Date: 7/24/2011 
Entry: I continued to take down the unit 15357 to join the level of the wall F. 5058 (part west of the area). I had to remove nearly 40-50cm of soil. Therefore, I decided to go down an arbitrary level of 10-15cm and to level the area as soon as possible. One aim... click here for more... 
 
Name: JMR 
Team:  
Date: 7/25/2011 
Entry: Today DLG, while also doing a great job on the total station, finished his arbitrary layer of topsoil/disturbed soil U.15358 west of Sp.342 and 343. Tomorrow he will clean the planum to see in plan features that we can already see in the sections, includi... click here for more... 
 
Name: JMR 
Team:  
Date: 7/26/2011 
Entry: BOD continued removing lenses of infill in Spaces 450 and 452 (scraping U.15372). While doing so, she exposed further the plaster lump U.15373 which now really looks like a lump rather than a construction and continues further into the fill under bench F.... click here for more... 
 
Name: CMB 
Team:  
Date: 7/25/2011 
Entry: I finished the unit 15357 and in the west of the area the wall F.2424 continued on 45 centimeters wide. It seems that we see the end but it’s possible that so many perturbations cut this structure. The wall is clearly visible (level dark and level white) ... click here for more... 
 
Name: CMB 
Team:  
Date: 7/26/2011 
Entry: The unit 15357 is finish and we have token photo. The burial area (F.15346) was leveled but we didn’t see the cut of the burial. On the other hand, we saw very clearly the “pit” with its grey-black and loose sediment. I excavated it and it seemed to be mo... click here for more... 
 

Page: [1 2 ]

 