Displaying Diary Entries for Unit: 18370 |
Page 1 of 1 (Total Records: 8)
|
Name: | EUR |
Team: | |
Date: | 8/19/2012 |
Entry: | This was another day without workers and again we had to screen the soil ourselves. We were working simultaniously in two units: 18356 - including the central, SE, and NW spaces (excavated by EUR and CMF) and 17289 - only in the SW space (excavated by JMR... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/19/2012 |
Entry: | KTX took a photo of the “section” through F.5058 created by leaving the last centimetres towards F.2424 and then removed this rest of the wall, and of F.3351. During the last days, a crack had formed naturally when the material had dried out, allowing him... click here for more... |
|
Name: | EUR |
Team: | |
Date: | 8/20/2012 |
Entry: | Today was a stressful day overall. It took us over two hours to clean the building, but the wind was so strong that stuff used to get dusty again. The intention was to find the floor with a sondage (Unit 18370) in the center of the BLDG 105, but trouble a... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/20/2012 |
Entry: | CMF and EUR brushed their Building 105 for its first 3D-Scan. After this, CMF started on removing wall F.3349, which turned out to be quite disturbed, and uncovered nicely the tops of walls F.3352 and F.3350, starting from the northern part moving south. ... click here for more... |
|
Name: | EUR |
Team: | |
Date: | 8/21/2012 |
Entry: | Not much happening today at the building 105. We excavated (U. 18370) slow to preserve as much as possible from the 'collapse' in the central space of the building. We did take two-three sets of photos for documentation. In the NW corner, CMF noticed a fi... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/21/2012 |
Entry: | GWN worked further in his sondage. After taking out floor 18376, we saw two rectangles in the cut: a red rectangle in the west, and a dark grey rectangle in the east. Both seemed to be building material; they were rather homogeneous and we have seen both ... click here for more... |
|
Name: | EUR |
Team: | |
Date: | 8/22/2012 |
Entry: | The last day of excavation today. We excavated mostly in the northern area of the BLDG 105 (Unit 18370), which was slightly higher than the southern section. The goal was to reveal the collapse material without removing it. We also attempted to remove fil... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/22/2012 |
Entry: | Last day of excavation.
CMF and EUR did some small scale work on their collapse layer in sondage 18370, exposing a cluster of plaster fragments. The rest of this layer will be fore next year.
KTX removed the rest of buttress F.3301, exposing more of... click here for more... |
|
|