Entry: Today in TPC Trench 3 we set about removing an oven that was found on top of an older wall. The oven appears to predate the Hellenistic, but we remain unsure about a precise date. I found that this particular unit was very difficult to identify logical bo... click here for more... 
 
Name: CAW 
Team:  
Date: 7/26/2015 
Entry: At TPC Trench 3, we continued the excavation of unit 31311 as part of the removal of feature 7159, an oven or fire installation. This involved the removal of a collapsed wall of the oven, and taking further samples for areas of the pit containing phytolit... click here for more... 
 
Name: CAW 
Team:  
Date: 7/27/2015 
Entry: Whilst working on TPC Trench 3, we finalised work on the oven fill (unit 31311 feature 7159). This means we were able to remove the wall of the oven and can continue excavation in this area. The wall was quite small, and has been sampled (flotation, archi... click here for more... 
 