Displaying Diary Entries for Feature = 1314 |
Page 1 of 1 (Total Records: 5)
|
Name: | Roddy Regan |
Team: | Çatal |
Date: | 7/3/2004 |
Entry: | first dairy entry of the 2004 season
Richard had already started the exavation when I arrived. The area seemed very clean although much disturbed by later activityç the greek team had already removed the upper sequences within structure 10 this in 1... click here for more... |
|
Name: | Richard Turnbull |
Team: | Çatal |
Date: | 7/4/2004 |
Entry: | Roddy has pretty well covered what I've got up to so far - apart from the few ephemeral hearth? deposits and eroded floor layers I've been removing the platform extension F.1317 which was releeased by the excavation of floor (8086). F.1317 wasn't in great... click here for more... |
|
Name: | Richard Turnbull |
Team: | Çatal |
Date: | 7/5/2004 |
Entry: | Jason came up this morning and did the first shot of building 10 in it's entirety since we began excavating this year. Removed a narrow strip of horizontal plaster with red pigment on the surface (10615) that lay along the E.edge of F.1314 & F.1317. This... click here for more... |
|
Name: | Roddy Regan |
Team: | Çatal |
Date: | 7/7/2004 |
Entry: | Rather humid day under the shelter. What stated as a bit of a flap ended fine as we are about the shift some of the platforms or at least eat into them. It appears that what was considerd to be the the east wall and part of the south and north walls of... click here for more... |
|
Name: | Richard Turnbull |
Team: | Çatal |
Date: | 7/7/2004 |
Entry: | Most humid day under the shelter so far but at least the annoying black midgy things weren't so annoying today. Shahina came up this morning and she'd obviously been mentally chewing over our walls since she pointed out that we'd got walls sitting on top ... click here for more... |
|
|