Displaying Diary Entries for Feature = 224 |
Page 1 of 1 (Total Records: 4)
|
Name: | Craig Cessford |
Team: | Çatal |
Date: | 8/9/1998 |
Entry: | In space 154 we continued removing the deposits left against the walls. This revealed that the southern wall 224 has two quite large recessed features and the eastern wall 229 has one smaller one. The exact function of these is unclear as we have left the... click here for more... |
|
Name: | Craig Cessford |
Team: | Çatal |
Date: | 8/10/1998 |
Entry: | Another day mainly taken up by wall cleaning. In space 156 Åsa has laid out a grid as we appear to be coming down onto floors. In 157 Mark has removed some of the ‘collapse’ brick rubble deposit and has revealed the top of the threshold between 157 and 15... click here for more... |
|
Name: | Craig Cessford |
Team: | Çatal |
Date: | 8/11/1998 |
Entry: | Due to the holiday this is the effective end of week four which was only four days long. Åsa was ill so the only thing that happened in Space 156 was that Sharon cleaned the walls. In Space 157 Mark contined removing infilling and exposing more of the bin... click here for more... |
|
Name: | Craig Cessford |
Team: | Çatal |
Date: | 8/15/1998 |
Entry: | Back again after the holidays, for those who managed to get away at least. Adnan away so nothing happening in space 155. In 156 Åsa removed part of the collapsed wall. In 157 Mark removed some more infilling from the bins. In Space 154 Serdar removed infi... click here for more... |
|
|