The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Feature = 5052

Page 1 of 7 (Total Records: 64)
Name: TEB 
Team:  
Date: 7/26/2008 
Entry: Another busy and hectic Monday - but we have spaces finally! We have unveiled two new spaces. Space 340 is made up of four walls, features 2428 (units 16853 and 16854), 5052 (16855 and 16856), 5053 (units 16857 and 16858) and 2413 (units 16851 and 1685... click here for more... 
 
Name: DEL 
Team:  
Date: 7/26/2008 
Entry: So today Tom and I attempted to create a matrix for the whole of trench 5. The stratigraphy has rather been getting away from us recently and we felt it was time to sort it out properly before evrything got really complicated. There have been a few teethi... click here for more... 
 
Name: RBW 
Team:  
Date: 7/27/2008 
Entry: (A note to other west mounders who've been having this problem: If you go to Unit/Feature/Space number fields without saving the record, you'll lose anything you've typed in the diary field since Access last automatically saved). Today was the first d... click here for more... 
 
Name: JMR 
Team:  
Date: 7/30/2008 
Entry: Smooth workflow today. Maxime, Katie and me tried to find the borders of the disturbed area 16861, which turned out to be much larger than we thought. Its borders are not visible everywhere, but I think we got it quite well by feeling where the soil would... click here for more... 
 
Name: JMR 
Team:  
Date: 8/2/2008 
Entry: Another fun day. Katie and me removed more of the roomfill 16859 and then began cleaning the plaster on its walls. It turned out that in fact only the uppermost 5cm or less are plaster, underneath is seems to be completely missing, but instead we encounte... click here for more... 
 
Name: ER 
Team:  
Date: 8/7/2008 
Entry: Yesterday in the evening the 2007 DAI Reisestipendiaten arrived at Catalhoyuk, which is great fun for me, and I spent some hours after breakfast showing them around the mounds. We started the day with a thorough brushing of the whole trench 5 which is ... click here for more... 
 
Name: ER 
Team:  
Date: 8/9/2008 
Entry: First day of the last week, lots of problems solved today! As we got excellent results in defining the architectural pattern this year, we decided to not push ourselves down to floors etc. where we might hit a lot of interesting and time-consuming structu... click here for more... 
Sketch: Click here to open in a new window
 
Name: JMR 
Team:  
Date: 8/9/2008 
Entry: Thursday and this morning I cleaned the walls of space 340, so that it is now in a state that we could also leave it for next year if we run out of time. While cleaning it became clear that all walls F 5050, 5054/ 5053, 5052 and 2428 are plastered. The pl... click here for more... 
 
Name: JMR 
Team:  
Date: 8/10/2008 
Entry: Finished unit 16880 by taking a bit more off to make it more even and then cleaned everything for next year. Scraped a bit in order to find the outlines of the butress 5052 and found a plaster line that indicates its face that leads into the room. Unfortu... click here for more... 
 
Name: JMR 
Team:  
Date: 8/11/2008 
Entry: In the morning I was drawing space 340 an the adjacent walls/ butresses (F 5052, 5053/ 54, 2428, 2713). Then I was moved to space 345, where Ray has been working in the last days. I brushed the area in order to find the eastern wall, which was there indee... click here for more... 
 

Page: [1 2 3 4 5 6 7 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell