The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Feature = 5056

Page 1 of 3 (Total Records: 30)
Name: TEB 
Team:  
Date: 7/26/2008 
Entry: Another busy and hectic Monday - but we have spaces finally! We have unveiled two new spaces. Space 340 is made up of four walls, features 2428 (units 16853 and 16854), 5052 (16855 and 16856), 5053 (units 16857 and 16858) and 2413 (units 16851 and 1685... click here for more... 
 
Name: DEL 
Team:  
Date: 7/26/2008 
Entry: So today Tom and I attempted to create a matrix for the whole of trench 5. The stratigraphy has rather been getting away from us recently and we felt it was time to sort it out properly before evrything got really complicated. There have been a few teethi... click here for more... 
 
Name: JMR 
Team:  
Date: 7/26/2008 
Entry: Today there is one good and one bad message about the area Katie and me are working on. The good message is that after hours of scraping we identified four walls (features 5054, 5055, 5056 and 5057) which close space 341, the room whose fill we have been ... click here for more... 
 
Name: RBW 
Team:  
Date: 7/27/2008 
Entry: (A note to other west mounders who've been having this problem: If you go to Unit/Feature/Space number fields without saving the record, you'll lose anything you've typed in the diary field since Access last automatically saved). Today was the first d... click here for more... 
 
Name: ER 
Team:  
Date: 7/31/2008 
Entry: Today and yesterday were really good days out in the trench, despite PFB still being slightly ill, UY hitting his head on the sieve installation, and a few minor hand injuries while troweling ferociously. The trench looks more straightforward each day as ... click here for more... 
Sketch: Click here to open in a new window
 
Name: JMR 
Team:  
Date: 8/2/2008 
Entry: Another fun day. Katie and me removed more of the roomfill 16859 and then began cleaning the plaster on its walls. It turned out that in fact only the uppermost 5cm or less are plaster, underneath is seems to be completely missing, but instead we encounte... click here for more... 
 
Name: ER 
Team:  
Date: 8/7/2008 
Entry: Yesterday in the evening the 2007 DAI Reisestipendiaten arrived at Catalhoyuk, which is great fun for me, and I spent some hours after breakfast showing them around the mounds. We started the day with a thorough brushing of the whole trench 5 which is ... click here for more... 
 
Name: ER 
Team:  
Date: 8/9/2008 
Entry: First day of the last week, lots of problems solved today! As we got excellent results in defining the architectural pattern this year, we decided to not push ourselves down to floors etc. where we might hit a lot of interesting and time-consuming structu... click here for more... 
Sketch: Click here to open in a new window
 
Name: JMR 
Team:  
Date: 8/3/2010 
Entry: Third day of excavation in West Trench 5 for this year. On 1/8 we started by cleaning the eastern part of the trench, where sandbags had already been taken out. The western part, Spaces 343, 342 and 310 still have sandbags in them. After cleaning, EM... click here for more... 
 
Name: EMM 
Team:  
Date: 8/4/2010 
Entry: Diary entry of 03.08.2010 Today SCS and I excavated and finished Unit 15139 in Space 341. This roomfill looks very heterogeneous, interesting are especially the huge chunks of burned and unburned clay which seem to gather next to the walls/buttresses.... click here for more... 
 

Page: [1 2 3 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell