Displaying Diary Entries for Space: 156 |
Page 1 of 3 (Total Records: 22)
|
Name: | Craig Cessford |
Team: | Çatal |
Date: | 8/4/1998 |
Entry: | Another fun day in the North Area. As the infilling is now below the level of the walls I have tried to split the team up by space with an experienced person in each one. Effectively this means Adnan in 155, Åsa in 156, Mark in 157 and me in 154 with Shar... click here for more... |
|
Name: | Craig Cessford |
Team: | Çatal |
Date: | 8/6/1998 |
Entry: | End of week three and progress continues to be quite good. In space 156 Åsa seems to have almost reached the level of the floors and has begun taking out the second half of the room, so far no features have appeared. The blocking between spaces 156 and 15... click here for more... |
|
Name: | Åsa Berggren |
Team: | Çatal |
Date: | 8/9/1998 |
Entry: | This is a continuation of my general impressions. The sense of a dividing line between specialists and excavators is stronger than I first imagined. I thought it was just me not being used to the situation. But after the meetings discussing the methodolog... click here for more... |
|
Name: | Craig Cessford |
Team: | Çatal |
Date: | 8/10/1998 |
Entry: | Another day mainly taken up by wall cleaning. In space 156 Åsa has laid out a grid as we appear to be coming down onto floors. In 157 Mark has removed some of the ‘collapse’ brick rubble deposit and has revealed the top of the threshold between 157 and 15... click here for more... |
|
Name: | Åsa Berggren |
Team: | Çatal |
Date: | 8/10/1998 |
Entry: | Today’s excavation has been a bit slow as I have been dealing with the collapsed wall in space 156 and the soil above the surface I have found in the east part of the room. I am now excavating the western part. The soil is divided up in three parts, leavi... click here for more... |
|
Name: | Craig Cessford |
Team: | Çatal |
Date: | 8/11/1998 |
Entry: | Due to the holiday this is the effective end of week four which was only four days long. Åsa was ill so the only thing that happened in Space 156 was that Sharon cleaned the walls. In Space 157 Mark contined removing infilling and exposing more of the bin... click here for more... |
|
Name: | Craig Cessford |
Team: | Çatal |
Date: | 8/15/1998 |
Entry: | Back again after the holidays, for those who managed to get away at least. Adnan away so nothing happening in space 155. In 156 Åsa removed part of the collapsed wall. In 157 Mark removed some more infilling from the bins. In Space 154 Serdar removed infi... click here for more... |
|
Name: | Åsa Berggren |
Team: | Çatal |
Date: | 8/17/1998 |
Entry: | Space 156:
The fallen part of the western wall is now excavated and it did rest on the trampled surface below at the southern end. An accumulated deposit (may also be partly dumped at the northern end, unit numbers 3228, 3241, 3242, 3243) is under the wa... click here for more... |
|
Name: | Craig Cessford |
Team: | Çatal |
Date: | 8/18/1998 |
Entry: | Half way through the week and I am reasonably happy. Adnan is back and has started removing more infilling in space 155 but still no signs of floors although there is evidence that some raised structure at the souhern end has been truncated. Åsa in 156 ha... click here for more... |
|
Name: | Craig Cessford |
Team: | Çatal |
Date: | 8/20/1998 |
Entry: | Another week over, time is starting to fly by. In space 154 we are now down to surfaces all over and I have photographed the baulks. Next week we will record these, sample them and get rid of them. A small post-hole has turned up in the north-east corner.... click here for more... |
|
|