Name: Craig Cessford 
Team: Çatal 
Date: 8/4/1998 
Entry: Another fun day in the North Area. As the infilling is now below the level of the walls I have tried to split the team up by space with an experienced person in each one. Effectively this means Adnan in 155, Åsa in 156, Mark in 157 and me in 154 with Shar... click here for more... 
 
Name: Craig Cessford 
Team: Çatal 
Date: 8/6/1998 
Entry: End of week three and progress continues to be quite good. In space 156 Åsa seems to have almost reached the level of the floors and has begun taking out the second half of the room, so far no features have appeared. The blocking between spaces 156 and 15... click here for more... 
 
Name: Craig Cessford 
Team: Çatal 
Date: 8/9/1998 
Entry: In space 154 we continued removing the deposits left against the walls. This revealed that the southern wall 224 has two quite large recessed features and the eastern wall 229 has one smaller one. The exact function of these is unclear as we have left the... click here for more... 
 
Name: Craig Cessford 
Team: Çatal 
Date: 8/11/1998 
Entry: Due to the holiday this is the effective end of week four which was only four days long. Åsa was ill so the only thing that happened in Space 156 was that Sharon cleaned the walls. In Space 157 Mark contined removing infilling and exposing more of the bin... click here for more... 
 
Name: Craig Cessford 
Team: Çatal 
Date: 8/15/1998 
Entry: Back again after the holidays, for those who managed to get away at least. Adnan away so nothing happening in space 155. In 156 Åsa removed part of the collapsed wall. In 157 Mark removed some more infilling from the bins. In Space 154 Serdar removed infi... click here for more... 
 
Name: Craig Cessford 
Team: Çatal 
Date: 8/18/1998 
Entry: Half way through the week and I am reasonably happy. Adnan is back and has started removing more infilling in space 155 but still no signs of floors although there is evidence that some raised structure at the souhern end has been truncated. Åsa in 156 ha... click here for more... 
 
Name: Craig Cessford 
Team: Çatal 
Date: 8/20/1998 
Entry: Another week over, time is starting to fly by. In space 154 we are now down to surfaces all over and I have photographed the baulks. Next week we will record these, sample them and get rid of them. A small post-hole has turned up in the north-east corner.... click here for more... 
 
Name: Craig Cessford 
Team: Çatal 
Date: 8/24/1998 
Entry: Things have been a bit lonely in space 154 as Serdar has gone to 155 and Sharon has moved to 157. The baulks in space 154 have been drawn, sampled by Bill and Wendy and then completely removed. it feels so good to have got rid of them, the space is much m... click here for more... 
 
Name: Craig Cessford 
Team: Çatal 
Date: 8/27/1998 
Entry: End of another week, the season is beginning to feel like it is nearly over. In space 156 Asa has continued investigating the deposits up against the southern wall. She is making progress and I hope that she will get everything down to surface by the mi... click here for more... 
 
Name: Craig Cessford 
Team: Çatal 
Date: 8/30/1998 
Entry: It is now 23.18 in the evening. Between 20.00 and 20.30 I attended a meeting to discusss why people are not writing diaries. Between 20.30 and now I have spent all my time dealing with a set of samples [chemical/phytolith/phosphate] taken about a week ago... click here for more... 
 